FAQ'S
How
much does it cost to remodel a kitchen?
You can spend as little as $5000 or more than $80,000 for cabinets
and installation, depending upon the number of cabinets and
features, wood species and finish. Other costs that should be
included in your plans are counter tops, plumbing fixtures, kitchen
appliances, flooring and often considerable electrical work for
outlets and new kitchen lighting. Labor to install all these items
must also be budgeted as well as building permits if required. As
with most home projects, they can tend to expand as you get
underway. Sometimes, architectural work is also undertaken to
enlarge or substantially change the kitchen and breakfast areas.
What
is the process and where do we begin? The
first step is to make an appointment and visit our showroom to begin
to refine your choices from some of the many levels of quality and
types of construction and finishes that are available. The next step
is normally for us to visit your home and take actual measurements
of your kitchen space or review your architectural drawings if you
are planning construction, so that we can design a kitchen that will
maximize your use of space when it is finished. We will discuss
costs, types of construction, wood species, finishes and countertop
surfaces with you, showing you the weakness and strengths of each of
these options. We next prepare a custom design layout for your home.
Once we design and draw up a plan, the kitchen is priced out. When
you are pleased with the design and costs, we will then be prepared
to place the order with the cabinet fabricator. There is no
warehouse where inventoried cabinets are stored. All our cabinets
are built to the specifications for your desired application.
It generally takes between four to twelve weeks for the construction
and delivery of the new kitchen cabinets to your home site. At that
point the installation can get underway. If you wish to do your own
installation or use your own contractor, we are pleased to work with
you and complete a design and provide delivery of your cabinets. We
can also provide the complete installation of your new kitchen, if
that is your preference.
How
long does it take to complete the project once the construction is
underway? The removal of existing cabinets
and installation of the new ones can generally be done in three to
five days. More complicated kitchens will require several weeks to
install. Final precise measurements for the countertops cannot be
made until the cabinets supporting the countertops are installed.
The fabrication of the tops generally take one week for laminate and
up to four weeks for granite. Only then can the plumbing fixtures be
installed and connected. Needless to say, the coordination with
various tradesmen to do work other than the actual cabinet
installation can require several days to several weeks as well.
Why
should someone use the services of a kitchen designer rather than
avail themselves to one of the large home improvement centers?
Neither the home centers nor the kitchen designer actually construct
the cabinets. Many cabinet companies sell to both entities. However,
many of the cabinet companies do not sell to the large distribution
outlets. Certainly there are quality kitchen design staffs at some
of the large home centers and certainly there are some small-scaled
kitchen designers who are not capable of doing excellent work. One
of the main differences is that large home centers offer cabinets
from just the cabinet companies which the company's national buyer
has selected. Cabinets are just one of hundreds of home improvement
items that they purchase and resell. At Colorado Kitchen Designs, we
do not market refrigerators, dishwashers, washers, dryers, flower
pots, carpeting or window coverings. We do have the choice of the
many cabinet fabricators. We represent specific cabinet companies,
which we have selected based on their construction quality, their
value and the integrity and high quality service that they offer to
our customers. Since a new kitchen is a major investment, we have
chosen companies who have long demonstrated a track record of
standing behind their products and will resolve problems during both
the construction phase as well as long-term after the installation
is completed. We se every kitchen as a unique designs based on your
size and shape of available space, decor preferences, cooking needs
and budget. If you have special needs such as gourmet cooking, l
wheelchair accessible cabinets, kosher kitchen or other specific
needs we are experienced and eager to address these needs when we
design your kitchen. We have considerable experience having
personally designed and supervised the installation of hundreds of
kitchens from start to finish. |